Using the virtual cell concept for short-term production planning for flexible job shop manufacturing systems

Shu Hsing Chung*, Chin Yi Fang

*此作品的通信作者

研究成果: 雜誌貢獻期刊論文同行評審

10 引文 斯高帕斯(Scopus)

摘要

Short-term production planning (STPP) problems in flexible job shop manufacturing systems (FJSMS), which consist of computerized numerically, controlled (CNC) machines and dedicated machines, are discussed here. Short-term production planning problems of FJSMS include part type selection, process selection, batch sizing and part family/machine group formation. A proposed STPP system for FJSMS is developed for cases where production contents are frequently changed thus resulting in the physical machine layout being not justified. It mainly adopts a restricted-period planning approach, using a virtual cell's concept for solving the STPP problem. The planning goal of STPP is to satisfy quantity and due date requirements as determined by MRP/CRP, with due consideration to the features of NC machines and dedicated machines.

原文英語
頁(從 - 到)237-251
頁數15
期刊International Journal of Computer Integrated Manufacturing
6
發行號4
DOIs
出版狀態已發佈 - 1993
對外發佈

ASJC Scopus subject areas

  • 航空工程
  • 機械工業
  • 電腦科學應用
  • 電氣與電子工程

指紋

深入研究「Using the virtual cell concept for short-term production planning for flexible job shop manufacturing systems」主題。共同形成了獨特的指紋。

引用此