摘要
In this paper, we solve two problems in a 300-mm wafer fabrication facility (fab). Firstly, for the lot scheduling problem, we propose a multi-objective genetic programming based rule generator (MOGPRG) to evolve useful dispatching rules, which can provide near-optimal lot schedules concerning multiple objectives. Secondly, the overhead hoist transports (OHT) routing problem is considered. As the modern automated material handling system (AMHS) is capable of doing toolto-tool direct delivery, the congestion of OHTs may happen more often than the past. To deal with the traffic congestion in AMHS, a dynamic routing method is proposed to find the nearshortest and less-congested path for the OHT to travel along. It can reduce the traffic congestion and achieve fast lot delivery by adapting to the dynamic traffic environment. The proposed MOGPRG is integrated with the dynamic routing method to improve two fab performance metrics: mean cycle time and tardy rate. Experimental results show the effectiveness of the proposed MOGPRG and dynamic routing method.
| 原文 | 英語 |
|---|---|
| 文章編號 | 4811517 |
| 頁(從 - 到) | 1608-1613 |
| 頁數 | 6 |
| 期刊 | Conference Proceedings - IEEE International Conference on Systems, Man and Cybernetics |
| DOIs | |
| 出版狀態 | 已發佈 - 2008 |
| 對外發佈 | 是 |
| 事件 | 2008 IEEE International Conference on Systems, Man and Cybernetics, SMC 2008 - Singapore, 新加坡 持續時間: 2008 10月 12 → 2008 10月 15 |
UN SDG
此研究成果有助於以下永續發展目標
-
SDG 9 工業化、創新及基礎建設
ASJC Scopus subject areas
- 電氣與電子工程
- 控制與系統工程
- 人機介面
指紋
深入研究「Multiobjective lot scheduling and dynamic OHT routing in a 300-mm wafer fab」主題。共同形成了獨特的指紋。引用此
- APA
- Standard
- Harvard
- Vancouver
- Author
- BIBTEX
- RIS