跳至主導覽 跳至搜尋 跳過主要內容

A Delay Analysis for the Delivery of Downstream Safety Related Messages in Vehicle Ad Hoc Networks

研究成果: 書貢獻/報告類型 › 會議論文篇章

摘要

The delay incurred during which messages are transmitted by a vehicle to its downstream vehicles in a vehicle ad hoc network (VANET) is analyzed in this paper. In related works the recovery delay of rebuilding network disconnection has been calculated; however, most of them only consider upstream message transmissions. This work continues our previous research but uses a different analytical method. It is because our previous calculation method, in which the central limit theorem is used, is suitable for long distance message transmissions. When message transmissions are short-distance, previous analysis may lack good accuracy. Therefore, the recovery delay probability distribution for repairing a single network disconnection will first be calculated in this paper. Since the calculations include the sum of random variables, Laplace transform and its inverse transform will be used. Numerical results show that our analysis is very accurate.

原文英語
主出版品物標題ISPCE-ASIA 2021 - IEEE International Symposium on Product Compliance Engineering-Asia, Proceeding
發行者Institute of Electrical and Electronics Engineers Inc.
ISBN(電子)9781665443425
DOIs
出版品狀態已發佈 - 2021
事件2021 IEEE International Symposium on Product Compliance Engineering-Asia, ISPCE-ASIA 2021 - Taipei, 臺灣
持續時間: 2021 11月 30 → 2021 12月 1

出版品系列

名字ISPCE-ASIA 2021 - IEEE International Symposium on Product Compliance Engineering-Asia, Proceeding

會議

會議2021 IEEE International Symposium on Product Compliance Engineering-Asia, ISPCE-ASIA 2021
國家/地區臺灣
城市Taipei
期間2021/11/30 → 2021/12/01

ASJC Scopus subject areas

  • 安全、風險、可靠性和品質
  • 安全研究

指紋

深入研究「A Delay Analysis for the Delivery of Downstream Safety Related Messages in Vehicle Ad Hoc Networks」主題。共同形成了獨特的指紋。

引用此