TY - JOUR
T1 - A delay analysis for the delivery of downstream messages in a sparse VANET
AU - Huang, Jeng Ji
AU - Chen, Ting Yu
AU - Ferng, Huei Wen
AU - Liang, Yao Jen
AU - Kuo, Chin Guo
AU - Shiung, David
AU - Su, Chung Yen
PY - 2020
Y1 - 2020
N2 - In this paper, we analyze the delay of the message delivery from a vehicle to a downstream vehicular gateway in a sparse vehicle ad hoc network (VANET). Several research efforts have previously been devoted to the calculations of the rehealing delay in the restoration of a network disconnection; however, most of them focus only on the delivery of upstream messages. In this paper, we analyze the end-to-end delay of downstream message deliveries. This analysis is essential for many applications, e.g., aggressive driving identification, that requires regular collection of vehicle data, such as speed, location, etc. In our analysis, we calculate the first two moments of the rehealing delay, then utilize the central limit theorem (CLT) to derive the end-to-end delay distribution. Simulation results confirm that our analysis is very accurate for both the mean and the variance of the rehealing delay. It is observed from numerical results that opposite-directional traffic intensity plays a more important role in deciding the end-to-end delay than same-directional traffic intensity, and that comparing between up- and down-stream message deliveries, the former has a slightly shorter delay than the latter when traffic intensity is low, but they are comparable when it is high.
AB - In this paper, we analyze the delay of the message delivery from a vehicle to a downstream vehicular gateway in a sparse vehicle ad hoc network (VANET). Several research efforts have previously been devoted to the calculations of the rehealing delay in the restoration of a network disconnection; however, most of them focus only on the delivery of upstream messages. In this paper, we analyze the end-to-end delay of downstream message deliveries. This analysis is essential for many applications, e.g., aggressive driving identification, that requires regular collection of vehicle data, such as speed, location, etc. In our analysis, we calculate the first two moments of the rehealing delay, then utilize the central limit theorem (CLT) to derive the end-to-end delay distribution. Simulation results confirm that our analysis is very accurate for both the mean and the variance of the rehealing delay. It is observed from numerical results that opposite-directional traffic intensity plays a more important role in deciding the end-to-end delay than same-directional traffic intensity, and that comparing between up- and down-stream message deliveries, the former has a slightly shorter delay than the latter when traffic intensity is low, but they are comparable when it is high.
KW - connectivity
KW - rehealing delay
KW - Vehicle ad hoc networks (VANETs)
UR - http://www.scopus.com/inward/record.url?scp=85087027344&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85087027344&partnerID=8YFLogxK
U2 - 10.1080/02533839.2020.1771206
DO - 10.1080/02533839.2020.1771206
M3 - Article
AN - SCOPUS:85087027344
JO - Chung-kuo Kung Ch'eng Hsueh K'an/Journal of the Chinese Institute of Engineers
JF - Chung-kuo Kung Ch'eng Hsueh K'an/Journal of the Chinese Institute of Engineers
SN - 0253-3839
ER -